Butinge Terminal Resumed Operations

02-10-2006  News

MAZEIKIAI — Replacement of Single Point Mooring (SPM) buoy at Butinge terminal has been completed, and the Terminal has resumed operations. Replacement of the buoy was performed in compliance with requirements of SOFEC (designer and manufacturer of SPM). Works have been inspected and certified by American Bureau of Shipping (ABS).

Unloading of the tanker “Sparto“ starts today at approximately 10 a.m.

Contacts: 
Giedrius Karsokas
AB Mazeikiu Nafta
Tel.: +370 610 65298
Fax: +370 443 9 25 79
giedrius.karsokas@nafta.lt

« back

 
 
 

ORLEN Group brands